FSR was engaged to deliver full perimeter scaffold wrap and encapsulation, including catch fans to allow for concrete remediation works. This was a highly technical Layher scaffold, designed and engineered in line with MDJV engineering procedures. The build had a number of complexities including interaction with adjacent power lines, as well as load allowances for ground level stability. FSR delivered the scaffold for our client on time and budget.